SUMMARY PROPOSAL BUDGET
|
FOR NSF USE ONLY
|
|||||||||||||
ORGANIZATION
|
PROPOSAL NO.
|
DURATION (MONTHS)
|
||||||||||||
|
|
Proposed
|
Granted
|
|||||||||||
PRINCIPAL
INVESTIGATOR/PROJECT DIRECTOR
|
AWARD NO.
|
|
|
|||||||||||
A. SENIOR PERSONNEL: PI/PD, Co-PIs, Faculty
and Other Senior Associates
|
NSF-Funded
|
Funds
|
Funds
|
|||||||||||
List each separately with name and
title. (A.7. Show number in brackets)
|
Person-months
|
Requested By
|
Granted by NSF
|
|||||||||||
|
CAL
|
ACAD
|
SUMR
|
Proposer
|
(If Different)
|
|||||||||
1.
|
|
|
|
$
|
$
|
|||||||||
2.
|
|
|
|
|
|
|||||||||
3.
|
|
|
|
|
|
|||||||||
4.
|
|
|
|
|
|
|||||||||
5.
|
|
|
|
|
|
|||||||||
6.
( ) OTHERS (LIST INDIVIDUALLY ON BUDGET
EXPLANATION PAGE)
|
|
|
|
|
|
|||||||||
7.
( ) TOTAL SENIOR PERSONNEL (1-6)
|
|
|
|
|
|
|||||||||
B. OTHER PERSONNEL (SHOW NUMBERS IN BRACKETS)
|
|
|||||||||||||
1.
( ) POSTDOCTORAL ASSOCIATES
|
|
|
|
|
|
|||||||||
2.
( ) OTHER PROFESSIONALS (TECHNICIAN,
PROGRAMMER, ETC.)
|
|
|
|
|
|
|||||||||
3.
( ) GRADUATE STUDENTS
|
|
|
|
|
||||||||||
4.
( ) UNDERGRADUATE STUDENTS
|
|
|
|
|
||||||||||
5.
( ) SECRETARIAL - CLERICAL (IF CHARGED
DIRECTLY)
|
|
|
|
|
||||||||||
6.
( ) OTHER
|
|
|
|
|
||||||||||
TOTAL SALARIES AND WAGES (A + B)
|
|
|
|
|
||||||||||
C. FRINGE BENEFITS (IF CHARGED AS DIRECT
COSTS)
|
|
|
|
|
||||||||||
TOTAL SALARIES, WAGES AND FRINGE
BENEFITS (A + B + C)
|
|
|
|
|
||||||||||
D. EQUIPMENT (LIST ITEM AND DOLLAR AMOUNT FOR
EACH ITEM EXCEEDING $5,000.)
|
|
|||||||||||||
|
|
|||||||||||||
|
|
|||||||||||||
|
|
|||||||||||||
TOTAL
EQUIPMENT
|
|
|
||||||||||||
E. TRAVEL
|
1. DOMESTIC (INCL. CANADA, MEXICO AND U.S.
POSSESSIONS)
|
|
|
|||||||||||
|
2. FOREIGN
|
|
|
|||||||||||
F. PARTICIPANT SUPPORT
|
|
|||||||||||||
1. STIPENDS
|
$
|
|
|
|
||||||||||
2. TRAVEL
|
|
|
|
|
||||||||||
3. SUBSISTENCE
|
|
|
|
|
||||||||||
4. OTHER
|
|
|
|
|
||||||||||
TOTAL NUMBER OF PARTICIPANTS ( ) TOTAL
PARTICIPANT COSTS
|
|
|
||||||||||||
G. OTHER DIRECT COSTS
|
|
|
||||||||||||
1. MATERIALS AND SUPPLIES
|
|
|
||||||||||||
2. PUBLICATION/DOCUMENTATION/DISSEMINATION
|
|
|
||||||||||||
3. CONSULTANT SERVICES
|
|
|
||||||||||||
4. COMPUTER SERVICES
|
|
|
||||||||||||
5. SUBAWARDS
|
|
|
||||||||||||
6. OTHER
|
|
|
||||||||||||
TOTAL OTHER DIRECT COSTS
|
|
|
||||||||||||
H. TOTAL DIRECT COSTS (A THROUGH G)
|
|
|
||||||||||||
I. INDIRECT COSTS (F&A) (SPECIFY RATE
AND BASE)
|
|
|||||||||||||
|
|
|||||||||||||
|
|
|||||||||||||
TOTAL INDIRECT COSTS (F&A)
|
|
|
||||||||||||
J. TOTAL DIRECT AND INDIRECT COSTS (H + I)
|
|
|
||||||||||||
K. RESIDUAL FUNDS (IF FOR FURTHER SUPPORT OF
CURRENT PROJECT SEE GPG II.D.7.j.)
|
|
|
||||||||||||
L. AMOUNT OF THIS REQUEST (J) OR (J MINUS K)
|
$
|
$
|
||||||||||||
M. COST SHARING: PROPOSED LEVEL $
|
AGREED
LEVEL IF DIFFERENT: $
|
|||||||||||||
PI/PD
TYPED NAME AND SIGNATURE*
|
DATE
|
FOR NSF USE ONLY
|
||||||||||||
|
|
INDIRECT COST RATE VERIFICATION
|
||||||||||||
ORG. REP. TYPED NAME & SIGNATURE*
|
DATE
|
Date
Checked
|
Date
of Rate Sheet
|
Initials-ORG
|
||||||||||
|
|
|
|
|
||||||||||
NSF
Form 1030 (10/99) Supersedes All Previous Editions
|
*SIGNATURES REQUIRED ONLY FOR REVISED
BUDGET (GPG III.C)
|
INSTRUCTIONS FOR
USE OF SUMMARY PROPOSAL BUDGET
(NSF FORM 1030)
1. General
a. Each grant proposal, including requests for
supplemental funding, must contain a Budget in this format unless a pertinent
program announcement/solicitation specifically provides otherwise. A Budget need not be submitted for
incremental funding unless the original grant letter did not indicate specific
incremental funding or if adjustments to the planned increment exceeding the
greater of 10% or $10,000 are being requested.
b. Copies of NSF Form 1030 and instructions may
be reproduced locally.
c. A separate form should be completed for each
year of support requested. An additional
form showing the cumulative budget for the full term requested should be
completed for proposals requesting more than one year's support. Identify each year's request (e.g.,
"First year," or "Cumulative Budget," etc.) in the margin
at the top right of the form.
d. Completion of this summary does not
eliminate the need to document and justify the amounts requested in each
category. Such documentation should be
provided on additional page(s) immediately following the budget in the proposal
and should be identified by line item.
The documentation page(s) should be titled "Budget
Justification."
e. If
a revised budget is required by NSF, it must be signed and dated by the
Authorized Organizational Representative and Principal Investigator and
submitted in at least the original and two copies.
2. Budget
Line Items
A full
discussion of the budget and the allowability of selected items of cost is
contained in the Grant Proposal Guide (GPG),
NSF Grant Policy Manual (GPM) (NSF
95-26, periodically revised), and other NSF program
announcements/solicitations. The following
is a brief outline of budget documentation requirements by line item. (NOTE:
All documentation or justification required on the line items below should be
provided on the Budget Justification page(s).)
A., B., and C. Salaries, Wages and Fringe Benefits (GPM 611). See definitions in GPG Appendix C. List individually, all senior personnel who
were grouped under Part A, the requested person-months to be funded, and rates
of pay.
D. Equipment (GPM 612). Items exceeding $5,000 and 1 year's useful
life are defined as permanent equipment (unless lower thresholds are
established by the organization). List
item and dollar amount for each item. Justify.
E. Travel (GPM 614 and GPM 760). Address the type and extent of travel and its
relation to the project. Itemize by
destination and cost and justify travel outside the United States and its
possessions, Puerto Rico, Canada and Mexico.
Include dates of foreign visits or meetings. Air fares are limited to round trip,
jet-economy rates.
F. Participant Support (GPM 618). Normally, participant support costs only may
be requested for grants supporting conferences, workshops, symposia or training
activities. Show number of participants
in brackets. Consult GPG or specific
program announcement/solicitation for additional information.
G. Other Direct Costs.
1. Materials and Supplies (GPM 613). Indicate
types required and estimate costs.
2. Publication, Documentation and
Dissemination (GPM 617). Estimate costs
of documenting, preparing, publishing, disseminating, and sharing research
findings.
3. Consultant Services (GPM 616). Indicate
name, daily compensation (limited to individual's normal rate or daily rate
paid for Level IV of the Executive Schedule, whichever is less), and estimated
days of service, and justify. Include
travel costs, if any.
4. Computer Services (GPM 615). Include
justification based on estimated computer service rates at the proposing institution. Purchase of equipment should be included
under D.
5. Subawards
(GPM 313). Also include a complete signed budget NSF Form 1030 for each
subaward and justify details.
6. Other.
Itemize and justify. Include computer equipment leasing and tuition
remission. (GPG II.D.7.f and
II.D.7.a.ii)
I. Indirect Costs (GPM 630) (Also known as Facilities and
Administrative Costs for colleges and universities). Specify current rate(s)
and base(s). Use current rate(s)
negotiated with the cognizant Federal negotiating agency. See GPM for special
policy regarding grants to individuals, travel grants, equipment grants,
doctoral dissertation grants and grants involving participant support costs
(GPM, Chapter VI).
K. Residual Funds (GPG II.D.7.j). This line is used only for budgets for
incremental funding requests on continuing grants. Grantees should provide a
rationale for residual funds in excess of 20% as part of the project
report. (See GPG VII.G)
L. Amount
of Request. Line L will be the
same as Line J unless the Foundation disapproves the carryover of funds. If disapproved, Line L will equal J minus K.
M. Cost Sharing (GPM 330). Include any specific cost sharing amounts in
excess of the minimum one percent required under unsolicited research proposals. Include the estimated value of any in-kind
contributions. Discuss the source,
nature, amount and availability of any proposed cost sharing on the Budget
Justification page. If a proposal budget includes a specific cost sharing
level, the identified cost sharing level is expected to be included as a
requirement in the award.
PROPOSERS MUST NOT ALTER OR REARRANGE
THE COST CATEGORIES AS THEY APPEAR ON THIS FORM, WHICH HAS BEEN DESIGNED FOR
COMPATIBILITY WITH DATA CAPTURE BY NSF'S MANAGEMENT INFORMATION SYSTEM.
IMPROPER COMPLETION OF THIS FORM MAY RESULT IN RETURN OF PROPOSAL.
0 komentar:
Posting Komentar